River Restoration: River Gade

The client: Affinity Water

The site: River Gade, Piccotts End

The brief: Produce a plan for improving the banks of the River Gade, north of Hemel Hempstead.

Our solution: In order to sufficiently map the best places for improving the banks our Ecologist and Environmental Consultant calculated the cross-sectional area of the river by measuring the channel width and depth.

The result: This information was used to populate a plan identifying the existing cross sections and proposed cross sections to improve the banks.

Download PDF (183.66 KB)


loadingloading