Car Park Construction: Messenger Construction Ltd.

The client: Messenger Construction Ltd.

The site: Eastcote Car Park

The brief: Re-surface areas of car park where the existing surface material had become depressed.

Our solution: Firstly, we sectioned the working areas of the car park from the public using Heras Fencing. We then installed new stakes to repair timber edgings which had been damaged by vehicles and replaced damaged timber with tantalised pressure treated softwood. The existing surface material was then raked back and the Golpla modules and securing nails were lifted. An additional type 1 sub-base was prepared to form a new sub base level and the Golpla modules were reinstated. Grey basalt chipping was then used to re-surface the car park.